Sewing Construction & Textiles 1
Lesson Plans
Strand 4
Students will implement pre-construction skills at the introductory level.
Standard 2
Identify information found on the guide sheet.
-
Measuring Up!
Students will learn how to measure the body correctly for proper fit.
Students will observe how to properly measure a body for correct pattern fit, and then they will perform measurements on themselves and a partner.
Students will also alter pattern pieces by adding and shortening lengths.
-
Pattern Layout
Students will demonstrate how to lay a pattern out correctly. Students will be instructed on how to lay a pattern out correctly on the straight of the grain, and then will practice laying out pattern pieces correctly.
http://www.uen.org - in partnership with Utah State Board of Education
(USBE) and Utah System of Higher Education
(USHE). Send questions or comments to USBE
Specialist -
Kristina
Yamada
and see the CTE/Arts, Audio/Visual Technology and Communication website. For
general questions about Utah's Core Standards contact the Director
-
THALEA
LONGHURST.
These materials have been produced by and for the teachers of the
State of Utah. Copies of these materials may be freely reproduced
for teacher and classroom use. When distributing these materials,
credit should be given to Utah State Board of Education. These
materials may not be published, in whole or part, or in any other
format, without the written permission of the Utah State Board of
Education, 250 East 500 South, PO Box 144200, Salt Lake City, Utah
84114-4200.